Menu

How to size your UPS

14-10-2014

Choosing a UPS with the right capacity for your commercial or industrial application may appear as a simple task. In reality however, making the correct choice depends on knowledge and understanding of your site’s load and its characteristics. This usually involves a site survey to determine not only the nature of the critical load but also how it varies over time. Authored by Matt Henley, Technical Sales Manager for Uninterruptible Power Supplies Limited, this article looks at these issues and explains how to allow for them when choosing a UPS for installation on your site. Although typically associated with data centres, Uninterruptible Power Supply (UPS) systems are finding their way into an ever-widening, diverse range of environments. This is due to the increasing number of telecoms, medical, industrial processing, retail and other applications that now rely critically on electrical equipment and power availability. Such applications impose widely varying loads on their UPSs; these must be understood and quantified to allow selection of an adequate, cost-effective UPS solution. Clearly the load at any given site will be unique, depending on the mix of equipment in its make-up. However, the load will also be time-variant in several ways. There will be daily and weekly variations as office occupancy and equipment use drops overnight or during weekends and holidays, as well as seasonal variations in the weather, and demand on air-conditioning or heating changes. Longer term changes arising from operational expansion and the addition of new equipment are also likely. Investigation of the critical load’s on site components, including measurement of the load’s performance over a meaningful time, is a necessary part of the UPS sizing exercise. Within the UK, the UPS is usually fed from the National Grid electrical mains, and feeds the site’s critical load. During a mains failure, the UPS batteries maintain supply. To start sizing the UPS, the load should be scoped in terms of its required supply voltage, frequency, number of phases, load current, power factor and power consumption. Equipment supply voltage is usually stated on an attached label or plate, or within the manufacturer’s literature. The UK supply voltage prior to EU harmonization was 240 V; even after harmonization at 230 V the UK grid could still be (and usually is) run at 240 V nominal while remaining within EU harmonized tolerance. Meanwhile, equipment, especially if supplied into Europe, could be rated at 220, 230 or 240 V. Therefore it is important to check that the UPS output voltage is within the tolerance of all on site equipment. Equipment should also be compatible with the UK’s nominal frequency of 50 Hz, and may be single- or three-phase. Whereas a three-phase UPS can supply both single- and three-phase loads, a single-phase UPS can only supply single-phase loads. UPS manufacturers express their products’ power capability in VA or kVA. Meanwhile, equipment power consumption may be expressed in Watts. If so, its contribution to the load in VA can be found by multiplying its load current by its supply voltage. Alternatively its power consumption in Watts can be divided by its stated Power Factor to reveal its VA load. Manufacturers frequently overstate their equipment consumption by 20% or so to ensure the installer provides an adequate supply; however this over-rating cannot be relied on, and if in doubt the load should be measured. This measurement activity can form part of the overall site survey. This should include installing portable measuring and monitoring equipment to record information about the load over a period of time. The period depends on the site situation; for example it would be misleading to monitor an office network over a weekend when very few staff have their PCs on.

Visit the Kohler Uninterruptible Power website for more information on How to size your UPS

ENQUIRY FORM

More News

  • Blockchain and the need for scaling

  • UPS installation

  • Generators: physical and environmental considerations

  • Choosing the right generator