Standby Power Equipment Relocation
Thinking of moving offices, premises or having a major re-organisation? Then youll need to think about moving your standby power system.Premises moves are an expensive disruption that no-one wishes for, so theyre only carried out for very good reasons. Responsibility for the move is often given to a trusted member of your management team. The last thing theyll need is someone letting your company down.
We hope youll call us well in advance to advise on standby power at the new location. If youre moving for expansion, this may be a good time to upgrade your existing standby power system – moves can be expensive, and the easiest and least expensive time to install a new system is before you move in!
Careful PlanningGenerator being installed at Inter Ads, London.
A smooth move is the result of careful planning and forethought, with attention to detail and safe working procedures as primary considerations. Our engineers will analyse the move in detail first, making site surveys at each location. Theyll double-check doorway dimensions and the weight limitations of your lifts. Theyll make sure that corridors, stairs and floors used to move the equipment are up to the job. Theyll ensure that the proposed location is within environmental tolerances for the equipment concerned, and that power supply and distribution subsystems are appropriate for the incoming equipment. A risk assessment and method statement can then be drawn up in consultation with your project manager.
Structural Considerations
Where the specifications of load-bearing floors are in doubt, we can employ the services of a structural engineer on your behalf. If additional support is required, we can arrange to have it built and installed for you.
Delivery and Offload
We employ specialist transport companies with the equipment and experience necessary to move heavy, delicate loads properly and our project managers liaise with them to ensure timetables are adhered to on the day.
Reconnection and Commissioning
Finally we reconnect and re-commission your equipment, review and update your maintenance details (and our own records!) and hand the installation over to you.
Visit the UPS Systems plc website for more information on Standby Power Equipment Relocation